调相机厂用电的研究Research on Auxiliary Power System in Rotary Condenser
沈洪流,钱翊
SHEN Hongliu,QIAN Yi
摘要(Abstract):
通过分析调相机运行负荷和起动负荷的特征,结合换流站电源情况和施工现状,提出了2种换流站加装调相机工程的厂用电接线方案。通过技术经济比较,认为方案1适用于换流站和调相机同期建设的工程,方案2适用于调相机扩建工程,针对调相机扩建工程给出对已建换流站影响最小且切实可行的厂用电接线方案。
By analyzing characteristics of operation load and start-up load of rotary condenser, the paper proposes two auxiliary power wiring schemes for rotary condenser installation in converter station on the basis of converter power and construction condition. Through technical and economic comparison, it is believed that the first scheme is applicable to projects with converter station and rotary condenser synchronously constructed; the second scheme is applicable to rotary condenser expansion project. Therefore, a feasible auxiliary power wiring scheme that has minimum impact on existing converter station is presented.
关键词(KeyWords):
调相机;起动负荷;厂用电源
rotary condenser;start-up load;auxiliary power
基金项目(Foundation):
作者(Author):
沈洪流,钱翊
SHEN Hongliu,QIAN Yi
DOI: 10.19585/j.zjdl.2017.02.005
参考文献(References):
- [1]康世崴,沙志成,刘之华.关于临沂换流站调相机接入系统关键问题的研究[J].国网技术学院学报,2016(4):45-48.
- [2]郭一兵,凌在汛,崔一铂,等.特高压交直流系统动态无功支撑用大型调相机运行需求分析[J].湖北电力,2016(5):1-4.
- [3]DL/T 5153-2014火力发电厂厂用电设计技术规程[S].北京:中国电力出版社,2014.
- [4]水利电力部西北电力设计院.电力工程电气设计手册电气一次部分[M].北京:中国电力出版社,1989.
- [5]彭峻.提高发电厂厂用电系统可靠性的措施分析[J].浙江电力,2013,32(8):61-63.
- [6]杨泽荣.大型发电厂厂用电源切换存在的问题及解决方法[J].浙江电力,2004,23(5):32-35.
- [7]周平,金军.300 MW发电机组厂用电系统问题探讨[J].浙江电力,2000,19(1):32-34.
- [8]贾涵.无功功率补偿在发电厂厂用电系统的应用[J].华电技术,2016(3):50-51.