海上风电高抗匝间保护误动分析及对策建议Maloperation analysis and suggested countermeasures for inter-turn protection of high-voltage shunt reactors in offshore wind power transmission
曹文斌,潘武略,戚宣威,陈水耀,方芳,陈旭
CAO Wenbin,PAN Wulue,QI Xuanwei,CHEN Shuiyao,FANG Fang,CHEN Xu
摘要(Abstract):
针对现场频发的海上风电输电海缆高压并联电抗器(以下简称“高抗”)匝间保护在常规分、合闸操作过程中的误动问题,开展了误动场景分析并提出相应对策建议。首先,对比不同厂家的匝间保护原理并解析不同操作场景下的误动过程。接着,总结出合闸时因铁心饱和产生零序源而被误判为内部故障及谐振期间电流幅值增大导致测量阻抗减小是保护误动的原因。然后,通过仿真复现了现场操作场景下的录波波形,验证了理论分析的正确性。最后,提出增加零序涌流谐波闭锁判据、增加谐振频率识别判据、操作时高抗侧开关先合后分等防误动措施。
Misoperation of the inter-turn protection of high voltage shunt reactors(HVSRs) frequently occurs in submarine cables for offshore wind power transmission during conventional opening and closing operations. The misoperation scenarios are analyzed, and corresponding countermeasures are put forward. Firstly, the inter-turn protection principles of different manufacturers are compared, and the misoperation processes under different operation scenarios are examined. Secondly, it is concluded that the core saturation generates a zero-sequence source during closing. The decreased measured impedance due to the increased current amplitude during resonance results in protection misoperation. Thirdly, the waveforms recorded in the field operation scenario are reproduced via simulation to verify the correctness of the theoretical analysis. Finally, it is suggested to adopt misoperation countermeasures, such as increasing the zero-sequence inrush current harmonic blocking criteria, resonant frequency identification criteria, and opening the switch on the high-reactance side and closing it afterward during operation.
关键词(KeyWords):
高压并联电抗器;匝间保护;铁心饱和;LC谐振
high-voltage shunt reactor;inter-turn protection;core saturation;LC resonance
基金项目(Foundation): 国网浙江省电力有限公司科技项目(5211DS22000U)
作者(Author):
曹文斌,潘武略,戚宣威,陈水耀,方芳,陈旭
CAO Wenbin,PAN Wulue,QI Xuanwei,CHEN Shuiyao,FANG Fang,CHEN Xu
DOI: 10.19585/j.zjdl.202301007
参考文献(References):
- [1]严华江,章坚民,胡瑛俊,等.考虑空间相关性的分布式光伏发电出力预测及误差评价指标研究[J].浙江电力,2020,39(3):54-60.YAN Huajiang,ZHANG Jianmin,HU Yingjun,et al.Distributed photovoltaic power generation output prediction based on spatial correlation and error evaluation indexes[J].Zhejiang Electric Power,2020,39(3):54-60.
- [2]金迪,潘郁,周家华,等.考虑高渗透率光伏接入的分布式储能优化配置[J].浙江电力,2020,39(3):68-74.JIN Di,PAN Yu,ZHOU Jiahua,et al.Optimal configuration of distributed energy storage considering highpenetration photovoltaic access[J]. Zhejiang Electric Power,2020,39(3):68-74.
- [3]倪爽,崔承刚,郑庆荣,等.基于多风电相关性场景生成法的配电网随机多目标无功优化[J].浙江电力,2020,39(11):103-111.NI Shuang,CUI Chenggang,ZHENG Qingrong,et al.Stochastic multi-objective reactive power optimization of distribution network based on multiple wind turbines correlative scenario generation method[J]. Zhejiang Electric Power,2020,39(11):103-111.
- [4]张谦,蒋永梅,丁敏,等.双馈风电机组高电压穿越协调控制策略[J].浙江电力,2019,38(2):57-61.ZHANG Qian,JIANG Yongmei,DING Min,et al.A coordinated control strategy for high voltage ride-through of doubly-fed induction generator[J]. Zhejiang Electric Power,2019,38(2):57-61.
- [5]迟永宁,梁伟,张占奎,等.大规模海上风电输电与并网关键技术研究综述[J].中国电机工程学报,2016,36(14):3758-3771.CHI Yongning,LIANG Wei,ZHANG Zhankui,et al.An overview on key technologies regarding power transmission and grid integration of large scale offshore wind power[J].Proceedings of the CSEE,2016,36(14):3758-3771.
- [6]曲名新,康慨,邓少平,等.基于海上风电场无功补偿的长距离高压海底电缆截面选择研究[J].自动化应用,2019(10):44-46.QU Mingxin,KANG Kai,DENG Shaoping,et al. Research on selection of cross section of long distance high voltage submarine cable based on reactive power compensation of offshore wind farm[J].Automation Application,2019(10):44-46.
- [7]戴飞扬,周泽昕,李勇,等.高压并联电抗器匝间保护防饱和误动方法研究[J].电网技术,2021,45(5):1993-2000.DAI Feiyang,ZHOU Zexin,LI Yong,et al.Maloperation prevention for inter-turn protection of high voltage shunt reactor[J].Power System Technology,2021,45(5):1993-2000.
- [8]赵大伟,马进,钱敏慧,等.海上风电场经交流电缆送出系统的无功配置与协调控制策略[J].电网技术,2017,41(5):1412-1421.ZHAO Dawei,MA Jin,QIAN Minhui,et al. Reactive power configuration and coordinated control of offshore wind farms connected to power grid with AC cables[J].Power System Technology,2017,41(5):1412-1421.
- [9]肖凌,乐瑶.海上风电220 kV高压电抗器补偿方式研究[J].企业技术开发,2018,37(12):84-85.XIAO Ling,YUE Yao.Research on compensation method of 220 kV high voltage reactor for offshore wind power[J].Technological Development of Enterprise,2018,37(12):84-85.
- [10]陈卫,陈德树,尹项根,等.基于零序幅值比较的电抗器匝间保护[J].电力系统及其自动化学报,2006,18(4):41-44.CHEN Wei,CHEN Deshu,YIN Xianggen,et al.Investigation of shunt reactor interturn protection based on zero sequence magnitude comparison[J]. Proceedings of the CSU-EPSA,2006,18(4):41-44.
- [11]李斌,李永丽,陈军,等.超高压输电线并联电抗器的匝间短路保护[J].天津大学学报,2005,38(8):717-721.LI Bin,LI Yongli,CHEN Jun,et al. Turn-to-turn faults protection of EHV shunt reactors[J]. Journal of Tianjin University,2005,38(8):717-721.
- [12]辛振涛,尹项根,杨经超,等.基于等效电感的超高压并联电抗器匝间保护新原理[J].电力系统自动化,2004,28(10):73-75.XIN Zhentao,YIN Xianggen,YANG Jingchao,et al. A novel principle of the ehv parallel connection reactor interturn protection based on an equivalent inductance[J].Automation of Electric Power Systems,2004,28(10):73-75.
- [13]常凤然,张洪.高压电抗器匝间保护的应用[J].河北电力技术,1998,17(2):26-28.CHANG Fengran,ZHANG Hong. Application of interturn protection for high voltage reactor[J].Hebei Electric Power,1998,17(2):26-28.
- [14]水利电力部西北电力设计院.电力工程电气设计手册第一册:电气一次部分[M].北京:中国电力出版社,1989.