浙江电力

2013, v.32;No.206(06) 10-14

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

中心城区10kV配电网网架结构优化研究
Research on Optimization of Truss Structure of 10 kV Distribution Networks in Central Urban Areas

高翔,朱昊,陈本柱,韦钢
GAO Xiang1,ZHU Hao2,CHEN Ben-zhu1,WEI Gang2(1.Changle Power Supply Co.

摘要(Abstract):

随着我国城市化进程的加快,各大、中城市中心城区10 kV配电网网架结构已难以适应日益增长的负荷需求,亟待对中心城区配电网网架结构进行优化改造。针对中心城区负荷密度高、增长迅速等特点,提出主变压器互联结构模型,并考虑以K型站为主的接线模式,构建了适合中心城区的10kV配电网网架模型。研究成果可为中心城区10 kV配电网远景目标网架规划提供参考。
With the increasingly rapid progress of urbanization of China,the truss structures of 10 kV distribution networks in central urban areas of large and medium cities are already unable to adapt the demand of increasing load.The truss structures of distribution networks in central urban areas urgently need to be optimized and transformed.Aiming at high density and rapid increase of load in central urban areas,the paper proposes a structure model of main transformer interconnection and a wiring mode giving priority to K-type station,establishing a truss structure of 10 kV distribution networks suited to central urban areas.The research can provide reference to prospective truss planning of 10 kV distribution networks in urban areas.

关键词(KeyWords): 中心城区;网架结构;供电能力;接线模式
central urban areas;truss structure;power supply capability;connection mode

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 高翔,朱昊,陈本柱,韦钢
GAO Xiang1,ZHU Hao2,CHEN Ben-zhu1,WEI Gang2(1.Changle Power Supply Co.

DOI: 10.19585/j.zjdl.2013.06.003

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享