600MW机组渣煤水处理系统运行情况评估Operation Evaluation of Slag and Coal Water Treatment System for 600 MW Unit
李治国,金伟刚
LI Zhi-guo,JIN Wei-gang(Zhejiang Electric Power Test and Research Institute
摘要(Abstract):
对某600 MW机组渣煤水系统的设计容量、进水量、溢流情况等进行了评估,提供了渣煤水系统水量平衡图并进行了水质分析,探讨了造成渣煤水溢流的原因并提供了解决建议,同时对渣煤水处理系统扩容和出水回用等方面提供了相关建议。
The design capacity,water inflow,and overflow of the slag and coal water system for the 600 MW unit were evaluated.The water analysis was carried out based on the water balance diagram of the system.And the reasons and solutions of slag and coal water overflow are explored.Furthermore,some recommendations are put forward for the expansion of slag and coal water treatment system and the reuse of wastewater.
关键词(KeyWords):
600MW;渣煤水;溢流;评估
600 MW;slag and coal water;overflow;evaluation