1000MW机组风烟系统故障分析及优化
Analysis and Optimization of Flue Gas System Fault of 1000 MW Units

钱义生
QIAN Yi sheng

摘要(Abstract):

分析了宁海发电厂1 000 MW机组自投产以来风烟系统存在的问题,给出了问题的解决方法,提高了机组运行的稳定性和经济性。
This paper analyzes problems of flue gas system in 1 000 MW units of Ninghai Power Plant since the operation, and it gives a solution to the problem and improves the stability and economical efficiency of units operation.

关键词(KeyWords): 1000MW;风烟系统;失速;喘振;性能曲线;抢风
1 000 MW;flue gas system;stall;surge;performance curve;air grabbing