600MW机组给水泵密封水问题分析及对策
Problem Analysis and Disposal for Sealing Water System of Feed Water Pump in 600 MW Unit

赵世伟,许飞,王川川
ZHAO Shiwei,XU Fei,WANG Chuanchuan

摘要(Abstract):

艾伦发电厂2×600 MW机组给水泵密封水系统运行中存在真空泄漏、溢流等问题,通过对相关问题进行系统分析,对密封水系统运行方式进行了优化,并对系统进行了一定的技术改造,彻底解决了密封水系统存在的问题,保证了机组安全稳定经济运行。
In Alan Power Plant, the feed water pump sealing water system of 2×600 MW unit has some problems in the operation, such as vacancy leakage and frequent overflow. By systematic analysis of the problem,the operating mode of sealing water system is optimized, and technological transformation on the system is implemented. The problem in the sealing water system is solved, and operation safety, stability and economy are guaranteed.

关键词(KeyWords): 给水泵;密封水;分析;优化
feed water pump;sealing water;analysis;optimization

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 赵世伟,许飞,王川川
ZHAO Shiwei,XU Fei,WANG Chuanchuan

DOI: 10.19585/j.zjdl.2016.11.012

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享