摘要(Abstract):

结合建筑行业的工业化发展,对推动变电站"工业化建设"的必要性和可行性进行分析,并结合装配式变电站的建设,提出了变电站"工业化建设"的内涵和重点,以促进变电站建设从"工业化建筑"向"工业化建设"的转变,又好又快地推动电网的建设。
In combination with industrialization of building,the paper analyzes necessity and feasibility of promoting industrialized construction of substation;furthermore,it proposes meaning and keynotes of industrialized construction of substation by combing construction of packaged type substation.Promote the transition of substation from "industrialized building" to "industrialized construction" to enable favorable and fast construction of power grid.

关键词(KeyWords): 变电站;建设;工业化
substation;construction;industrialized

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 陈飞,黄忠华,高亚栋
CHEN Fei,HUANG Zhong-hua,GAO Ya-dong(Z(P)EPC Economic Research Institute

DOI: 10.19585/j.zjdl.2013.07.012

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享