500kV变电站失去监控的原因分析及解决方案Cause Analysis and Solution to Monitoring Absence in 500 kV Substation
计荣荣,叶海明,单金华,张俭清,吴米佳
JI Rongrong,YE Haiming,SHAN Jinhua,ZHANG Jianqing,WU Mijia
摘要(Abstract):
500 kV变电站远动机出现IEC 104通道频繁关闭、重连现象。调度端多次总召唤却出现全零数据、刷屏现象,影响调度正常监控,并导致调度端失去该站监控。分析了该问题产生的具体原因,通过改造装置直流供电回路、优化远动机主CPU插件与NET通信插件互动机制以及完善NSC300与AK1703的通信参数设置等措施有效地解决了该问题。
IEC 104 channel of remote terminal unit in 500 kV substation frequently disconnected and reconnected. With multiple general calling of the dispatching terminal, there occurred all zeroes and screen flooding, which affects normal monitoring of dispatchers and substation monitoring absence in the dispatching terminal. This paper analyzes the specific reasons and proposes its solution. The problem is solved effectively by DC power supply circuit reconstruction, interaction mechanism optimization between the CPU plug-in and the NET communication plug-in as well as communication parameters improvement of NSC300 and AK1703.
关键词(KeyWords):
监控系统;通信机制;远动机;总控单元
monitoring system;communication mechanism;RTU;general control unit
基金项目(Foundation): 浙江省电力公司群众性科技创新项目(5211MB160010)
作者(Author):
计荣荣,叶海明,单金华,张俭清,吴米佳
JI Rongrong,YE Haiming,SHAN Jinhua,ZHANG Jianqing,WU Mijia
DOI: 10.19585/j.zjdl.2017.02.007
参考文献(References):
- [1]栾军,张智刚,寇惠珍,等.提高500 kV电网输电能力的技术研究[J].电网技术,2005,29(19):15-18.
- [2]金芬兰,王昊,范广民,等.智能电网调度控制系统的变电站集中监控功能设计[J].电力系统自动化,2015(1):247-253.
- [3]朱东升,孙纯军,陈飞.500 kV变电站远方集中监控系统方案探讨[J].电力自动化设备,2009,29(5):126-129.
- [4]黄立超,谷炜.500 kV变电站集中监控运行的实践[J].浙江电力,2015,34(5):32-35.
- [5]尹路,孟杰,林强.华北电网500k V变电站集中控制运行管理的探讨[J].华北电力技术,2011(1):48-52.
- [6]李红梅,厉吉文.变电站实施无人值班集中监控应具备的基本条件和原则[C]//第三届电力系统与电网技术综合年会论文集.1995.
- [7]丁泉,朱来强,胡道徐,等.变电站程序化操作及远动装置执行[J].电力自动化设备,2007,27(8):120-123.
- [8]丁峰.500 kV变电站远动系统配置优化分析[J].浙江电力,2009,28(6):31-33.
- [9]朱松林.变电站计算机监控系统及其应用[M].北京:中国电力出版社,2008.
- [10]DL/T 516-2006电力调度自动化系统运行管理规程[S].北京:中国电力出版社,2006.
- [11]吴刚,滕云,潘永刚,等.电力系统电压跌落相关问题初探[J].华北电力技术,2004(4):102-105.
- [12]DL/T 5149-2001 220~500 kV变电所计算机监控系统设计技术规程[S].北京:中国电力出版社,2001.