浙江电力

2011, v.30;No.186(10) 29-31

[打印本页] [关闭]
本期目录(Current Issue) | 过刊浏览(Archive) | 高级检索(Advanced Search)

降低高压海底电缆登陆段电能损耗的措施研究
Research on Power Loss Reduction Measures for Landing Parts of High Voltage Submarine Power Cables

何旭涛,马兴端,闫循平
HE Xu-tao,MA Xing-duan,YAN Xun-ping(Qiming Electric Power Design Institute

摘要(Abstract):

海底电力电缆施放在海底水域中,因其使用环境的特殊性,海底电缆通常采用粗钢丝铠装保护,从而产生较大的涡流和环流损耗,登陆段的损耗发热成为制约海底电缆输送容量的瓶颈。采用剥去登陆区段电缆的铠装钢丝并单端接地等工艺措施,能有效降低单芯海底电缆登陆段损耗,显著提升输送容量。
Steel armor has been widely used to protect submarine cables,which are laid under the sea,due to the specific characteristics of its operation environment.Therefore,submarine cables suffer great eddy current and circulating current losses.The heat generated in the landing parts of the cables becomes the bottleneck that constrains the transmission capacity.The technological measures such as removing the steel armor of the landing parts and perform single-end grounding can effectively reduce the loss in the landing parts of single-core submarine cables and significantly enhance the transmission capacity.

关键词(KeyWords): 海底电缆;登陆段;电能损耗;措施
submarine cables;landing parts;electric energy loss;measures

Abstract:

Keywords:

基金项目(Foundation):

作者(Author): 何旭涛,马兴端,闫循平
HE Xu-tao,MA Xing-duan,YAN Xun-ping(Qiming Electric Power Design Institute

DOI: 10.19585/j.zjdl.2011.10.009

扩展功能
本文信息
服务与反馈
本文关键词相关文章
本文作者相关文章
中国知网
分享