600 MW亚临界机组高压旁路阀内漏原因分析与改造Cause Analysis and Renovation of High-pressure Bypass Valve Leakage for a 600 MW Subcritical Unit
郭岩,郭欣瑀,张博,张中林
GUO Yan,GUO Xinyu,ZHANG Bo,ZHANG Zhonglin
摘要(Abstract):
高压旁路阀泄漏造成了高品质蒸汽的浪费,不仅降低了机组效率、增加了汽耗、浪费了减温水,而且增加了排汽装置的换热量,导致给水泵和凝结水泵能耗的增加;高压旁路阀泄漏还会降低凝汽器的真空度,导致端差增大,影响了机组效率,增加了煤耗。因此,采取有效的措施减少高压旁路阀门的内漏非常必要。在某600 MW亚临界空冷机组高压旁路阀内漏改造中,吸取平衡阀芯与非平衡阀芯的优点,将高压旁路阀改造为预启阀芯结构式阀门,成功解决了内漏问题,为同类机组类似问题的处理提供了参考。
High-pressure bypass valve leakage causes high quality steam waste, not only reducing the unit efficiency, increasing the steam consumption wasting the temperature reduction water but also increasing the heat exchange in exhaust steam device, which therefore leads to energy consumption increase of feedwater pump and the condensate pump; leakage of high-pressure bypass valve reduces the vacuum of the condenser,leads to terminal difference increase, affects the unit efficiency and increases the coal consumption. Therefore, it is necessary to take effective measures to reduce high-pressure bypass valve leakage. In renovation of high-pressure bypass valve leakage for a 600 MW subcritical unit, the advantages of balancing valve and unbalancing valve are maintained to reform high-pressure bypass valve into a valve with equalizing valve core,by which the leakage is successfully handled and can provide reference for the treatment of similar problems of the same units.
关键词(KeyWords):
高压旁路;内漏;改造
high-pressure bypass;leakage;renovation
基金项目(Foundation):
作者(Author):
郭岩,郭欣瑀,张博,张中林
GUO Yan,GUO Xinyu,ZHANG Bo,ZHANG Zhonglin
DOI: 10.19585/j.zjdl.201705012
参考文献(References):
- [1]徐传堂.600 MW超临界高压旁路阀内漏的技术改造[J].能源研究与利用,2015(6):44-45.
- [2]徐传堂,张大志.600 MW超临界汽轮机组高压旁路阀内漏原因分析及处理[J].节能,2009,28(7):54-55.
- [3]薄鼎彪.电厂高压旁路阀振动、内漏分析及其对策[J].湖州师范学院学报,2015,37(S1):21-22.
- [4]高建伟.600 MW超临界汽轮机高压加热器泄漏原因分析及处理[J].科技与企业,2012(23):282.
- [5]李丽萍,张成智,陈乔伟,等.超临界600 MW汽轮机高压导汽管法兰漏汽原因分析及处理[J].电站系统工程,2012,28(5):49-50.
- [6]马士东,袁洪涛.600 MW超临界汽轮机高压加热器泄漏原因分析及处理[J].电力技术,2010,19(Z1):32-35.
- [7]董益华,孙永平,应光耀,等.大型火电机组低加疏水不畅问题的分析及对策[J].浙江电力,2013,32(1):37-39.
- [8]陈统钱,余绍宋.600 MW超临界机组低加疏水不畅的分析和处理[J].浙江电力,2012,31(11):31-33.
- [9]张良军,李康良.600 MW机组高压加热器疏水控制系统改进[J].浙江电力,2011,30(3):40-42.