共享电力铁塔搭载通信基站经济效益分析模型
Economic Benefit Analysis Model of Communication Base Station on Shared Power Tower

刘欣博,李宗阳,刘帆
LIU Xinbo,LI Zongyang,LIU Fan

摘要(Abstract):

为了评估共享电力铁塔搭载通信基站的经济效益,提出共享铁塔成本模型,基于5G基站三种大功率供电方案分别计算其线路架设成本以及铁塔改造成本;根据电费和租金提出共享铁塔收益模型;给出经济效益分析模型,计算投资回本时间,定量评估电网公司共享铁塔的经济效益。由结果可知,当共享铁塔采用单相变压器供电方案时,电网公司5~6年即可收回成本。
A cost model is proposed to evaluate economic benefit of communication base station on shared power tower. Based on three powerful supply schemes for 5 G base station, line erection cost and tower reconstruction cost are calculated; benefit model of the shared tower is proposed according to electric bill and rent; an economic benefit analysis model is proposed to calculate cost recovery period and quantitatively evaluate economic benefit of the shared tower of power grid enterprise. As the result shows that the shared tower adopts single-phase transformer power supply scheme, the power grid enterprise can recover the cost in 5~6 years.

关键词(KeyWords): 共享铁塔;成本模型;效益模型;经济效益分析模型
shared tower;cost model;benefit model;economic benefit analysis model

Abstract:

Keywords:

基金项目(Foundation): 国网浙江省电力有限公司集体企业科技项目(ZJJTQY2019-71)

作者(Author): 刘欣博,李宗阳,刘帆
LIU Xinbo,LI Zongyang,LIU Fan

DOI: 10.19585/j.zjdl.202102013